CNC Technics Pvt. Ltd., a renowned manufacturer of filament winding machines and a proud supplier to the prestigious Chandrayaan project, sought a cutting-edge infrastructure solution to support its expanding operations. With a requirement for a crane provision and an insulation shed at their new facility in Ibrahimpatnam, CNC Technics needed a solution that was both highly functional and cost-efficient. They turned to Kishore Infratech Pvt. Ltd. for expertise in delivering scalable and tailored Pre-Engineered Buildings (PEBs) that would meet these demands.
Client Overview
- Company Name: CNC Technics Pvt. Ltd.
- Industry: Filament Winding Machines
- Registered Office: IDA Kukatpally, Telangana
- Project Location: Ibrahimpatnam, Telangana
- Project Requirements: Crane provision, insulated shed, and a cost-effective construction solution.
CNC Technics Pvt. Ltd. is a pioneering company in the filament winding machines industry, catering to both national and international clients. Their expertise and innovation have made them a key supplier to various critical projects, including India’s prestigious Chandrayaan mission. As part of their expansion efforts, CNC Technics required a state-of-the-art industrial shed to house specialized equipment and support their manufacturing process.
Challenges
As CNC Technics ventured into its new project in Ibrahimpatnam, several challenges arose:
- Crane Provision: The shed needed to accommodate a heavy-duty overhead crane system for handling large filament winding machinery.
- Insulation for Temperature Control: Given the nature of CNC Technics’ operations, the shed required high-quality insulation to maintain controlled temperatures, ensuring the integrity of their materials and products.
- Cost Efficiency: The project needed to be completed within a tight budget without compromising on quality, durability, or long-term performance.
Solution Provided by Kishore Infratech Pvt. Ltd.
Kishore Infratech Pvt. Ltd. stepped up to the challenge by proposing a tailored Pre-Engineered Building (PEB) solution that addressed CNC Technics’ specific needs while staying within budget. KIPL’s expertise in PEB design and construction allowed them to develop a robust, scalable, and cost-efficient facility.
- Crane Provision
KIPL incorporated a heavy-duty crane provision into the design of the PEB structure. This allowed CNC Technics to seamlessly install their overhead crane system, which is essential for maneuvering large filament winding machines within the facility. The PEB design ensured that the shed was structurally sound and could bear the load of the crane while allowing for smooth operations. - Insulated Shed for Temperature Control
To meet the insulation requirements, KIPL employed high-grade insulated panels that not only maintained temperature control but also provided noise reduction, energy efficiency, and durability. The shed’s insulation was crucial for CNC Technics to maintain the quality of their materials and equipment, especially given the precision required for filament winding machines. - Cost Efficiency
KIPL’s PEB solution drastically reduced the construction time, material waste, and labor costs, providing CNC Technics with a cost-effective solution without compromising on the quality or longevity of the building. By optimizing design, fabrication, and installation processes, KIPL was able to deliver a premium facility well within CNC Technics’ budget.
Outcome
The collaboration between CNC Technics Pvt. Ltd. and Kishore Infratech Pvt. Ltd. resulted in a highly functional, durable, and cost-effective industrial shed tailored to the specific needs of CNC Technics. The key outcomes include:
- Crane Integration: The facility was designed to accommodate CNC Technics’ crane system, allowing for efficient and safe handling of machinery.
- Insulation Excellence: The high-quality insulation provided temperature control and energy efficiency, ensuring that CNC Technics could maintain the precision and quality required for their filament winding machines.
- Cost-Effective Construction: The project was completed within budget, providing CNC Technics with significant cost savings while delivering a robust and scalable facility.
Client Testimonial
Mr. Vijay Krishna, the Managing Director of CNC Technics Pvt. Ltd., was thoroughly impressed with the results delivered by Kishore Infratech Pvt. Ltd. He shared the following testimonial:
“Kishore Infratech Pvt. Ltd. has delivered beyond our expectations with their expertise in PEB construction. Their ability to integrate a crane provision and provide superior insulation, all while maintaining cost efficiency, has been invaluable to our operations. The new facility is a testament to their commitment to quality and innovation. We are proud to have partnered with KIPL for this project, and we look forward to collaborating with them in the future.”
— Mr. Vijay Krishna, Managing Director, CNC Technics Pvt. Ltd.
Conclusion
The successful completion of this project underscores Kishore Infratech Pvt. Ltd.‘s ability to provide tailored Pre-Engineered Building (PEB) solutions for specialized industries. By delivering a durable, cost-efficient, and custom-designed facility, KIPL has enabled CNC Technics Pvt. Ltd. to enhance its manufacturing capabilities and position itself for continued success in the filament winding machines industry. This project highlights KIPL’s commitment to delivering world-class infrastructure solutions that cater to the specific needs of their clients across diverse industries.